We are so excited! Our first planting has finally happened. Everyone helped out as we planted a 1/4 acre of corn. It took some trial and error to get used to our seeder. Ron discovered that if you filled it up too much it was likely to drop multiple seeds in one spot. Originally, we had two seeders hooked together so we could plant two rows at a time, but sadly one seeder was dropping too many seeds and it was just too cumbersome to use. I didn't realize how big a 1/4 acre was until we had to plant all the seeds! Our goal is to plant 1 acre of corn this summer. Fingers crossed they grow big and strong.
This month we also got electricity! Since we don't have any permanent structures, we had to mount the electric meter on an outdoor panel cemented in the ground. Also, to meet code requirements, the meter panel had to include a main shut off installed at the same location. This different from how residential electricity is set up because the outdoor meters are typically installed close enough to the main panel inside the house so you don't need a separate disconnect. While we didn't appreciate the added cost and inconvenience, it worked out in the end. We dug a trench from the pole to our meter location, and then continued the trench to the shed where we chose to install a 200 amp panel. We have more than enough power available now for the well pump and controller, electric fence, and anything else we need to run. Now that we have electricity, we will be able to complete our electric fence installation.

Comments
Post a Comment