This month we also got electricity! Since we don't have any permanent structures, we had to mount the electric meter on an outdoor panel cemented in the ground. Also, to meet code requirements, the meter panel had to include a main shut off installed at the same location. This different from how residential electricity is set up because the outdoor meters are typically installed close enough to the main panel inside the house so you don't need a separate disconnect. While we didn't appreciate the added cost and inconvenience, it worked out in the end. We dug a trench from the pole to our meter location, and then continued the trench to the shed where we chose to install a 200 amp panel. We have more than enough power available now for the well pump and controller, electric fence, and anything else we need to run. Now that we have electricity, we will be able to complete our electric fence installation.
Now that we have a well, it is time to get that water to our plants. We will be bringing the water to the fields through buried water pipes. One thing we forgot to do when we prepared our fields was to dig ditches for the water pipes. Luckily, our tractor was able to fit around the fields and help dig most of our trenches. But, the areas between where we already planted need to be dug by hand. Phew! It's hard work, but very satisfying to see what one person with a shovel can do.
Comments
Post a Comment